REBUILT MACHINES
Rebuilt in our own shop in Roebuck
Stripped to the frame, rewired, painted, run under power, crated.
Call or text (864) 574-0404
Rebuilt tape edge machine with a stainless steel top
Everybody in this trade uses the word rebuilt. Here it means one thing, and it is the same thing on every machine: the machine comes apart down to the frame, the wear parts are measured and replaced, the sew head is rebuilt on the bench, the electrics are renewed, the machine is painted with an automotive finish, and then it is run under power before it is crated.
We rebuild James Cash, United, Spuhl Anderson, Porter and Atlanta Attachment tape edge machines, and we rebuild customer owned machines as well as our own. If you want to know exactly what was done to a particular machine, quote us the reference and we will pull the file.
What to look for
Ask what was replaced, not what was done
A rebuild that resets everything is not a rebuild. Ask which parts were measured and which were replaced.
Ask whether the head came off
A sew head rebuilt on the bench under a light is a different machine from one adjusted in place.
Ask about the corner
Slow corner control is what separates a machine an operator can run all day from one they fight.
Ask to see it running
Nothing leaves this shop that has not been run under power. We will send you the video.
More on this: A machine at each stage of a rebuild
The rebuild, step by step
STEP 1
Strip to the frame
Head off, carriage off, top off, drive out, wiring out. This is where we find out whether the machine is worth the work.
STEP 2
Measure and replace the wear parts
Track, bearings, clutch, lift screws and pivots measured. Anything outside tolerance is replaced or machined back.
STEP 3
Rebuild the sew head on the bench
Off the machine, stripped, wear parts replaced, hook and feed reset, timed and run before it goes near the table.
STEP 4
Renew the electrics
New components, a new panel where one is needed, and a new PLC on machines that take one. Wired for your own supply.
STEP 5
Automotive paint
Frame, table and carriage, with a hardened anti rub surface, so the top still looks right after a year of mattresses.
STEP 6
Run and test under power, then crate
Carriage walked round, corner control set, lift cycled, head sewing. We send you the video before it is crated.
What rebuilt means here
Take this table to any other seller and ask them to fill in their own column.
| Part | Rebuilt in our shop | Used, as inspected |
|---|---|---|
| Carriage | Track and bearings measured, worn parts replaced | Left as found |
| Table | Checked flat, stainless top where specified, extensions fitted | Left as found |
| Sew head | Stripped on the bench, reset, timed and run | Whatever is on it |
| Wiring | Renewed, and set for your voltage, phase and frequency | Original, as found |
| Paint | Automotive finish with a hardened anti rub surface | As found |
| Tested under power | Yes, and we send you the video | Inspected, and we say what we saw |
| Guarantee |
The guarantee row is blank because we will not publish a warranty sentence we have not written down. Ask us and we will tell you exactly what we stand behind on a given machine.
The three condition grades
New build
What is done. Built to a specification we set: table, head, lift, controls and supply.
What is not. Not a used machine, and never shown with a year.
Rebuilt in our shop
What is done. The six stages above, on our own floor, photographed.
What is not. Not a clean and a coat of paint.
Used, as inspected
What is done. Inspected and photographed as it stands. We say what we know.
What is not. Not stripped, not rewired, not repainted.
Brands we rebuild
We also rebuild your own machine. Send photographs of the machine, the head and the plate, tell us your supply and the mattress heights you close, and we will tell you what it needs.
Rebuilt machines in the catalogue: 59
See all rebuilt machinesTell us the machine you need
Tell us the size and the head, and we quote the same day.